29-30 lot Attaoufik - Sidi Mâarouf - 20190 Casablanca - MAROC
+ (212) 522 32 15 37/38
    Rehabilitation of the activated sludge treatment Station in Hoceima | ONEE | 3 l/s

    Rehabilitation of the activated sludge treatment Station in Hoceima

    In the modern industrialized world, construction usually involves the translation of designs into reality.

    | Client : ONEE

    | Situation : Saidia

    | Débit : 370 l/s

    | 
Catégorie : Pompage

    Descriptifx

    A formal design team may be assembled to plan the physical proceedings, and to integrate those proceedings with the other parts. The design usually consists of drawings and specifications, usually prepared by a design team including Architect, civil engineers, mechanical engineers, electrical engineers, structural engineers, fire protection engineers, planning consultants, architectural consultants, and archaeological consultants.

    LEAVE A COMMENT

    M’rirt aerated lagoon wastewater treatment Station | ONEE | 50 l/s

    M’rirt aerated lagoon wastewater treatment Station

    In the modern industrialized world, construction usually involves the translation of designs into reality.

    | Client : ONEE

    | Situation : Saidia

    | Débit : 370 l/s

    | 
Catégorie : Pompage

    Descriptifx

    A formal design team may be assembled to plan the physical proceedings, and to integrate those proceedings with the other parts. The design usually consists of drawings and specifications, usually prepared by a design team including Architect, civil engineers, mechanical engineers, electrical engineers, structural engineers, fire protection engineers, planning consultants, architectural consultants, and archaeological consultants.

    LEAVE A COMMENT

    Berkane aerated lagoon wastewater treatment Station | ONEE | 100 l/s

    Berkane aerated lagoon wastewater treatment Station

    In the modern industrialized world, construction usually involves the translation of designs into reality.

    | Client : ONEE

    | Situation : Saidia

    | Débit : 370 l/s

    | 
Catégorie : Pompage

    Descriptifx

    A formal design team may be assembled to plan the physical proceedings, and to integrate those proceedings with the other parts. The design usually consists of drawings and specifications, usually prepared by a design team including Architect, civil engineers, mechanical engineers, electrical engineers, structural engineers, fire protection engineers, planning consultants, architectural consultants, and archaeological consultants.

    LEAVE A COMMENT

    Station de prétraitement | RADEM | 4000 l/s

    Pretreatment station

    In the modern industrialized world, construction usually involves the translation of designs into reality.

    | Client : ONEE

    | Situation : Saidia

    | Débit : 370 l/s

    | 
Catégorie : Pompage

    Descriptifx

    A formal design team may be assembled to plan the physical proceedings, and to integrate those proceedings with the other parts. The design usually consists of drawings and specifications, usually prepared by a design team including Architect, civil engineers, mechanical engineers, electrical engineers, structural engineers, fire protection engineers, planning consultants, architectural consultants, and archaeological consultants.

    LEAVE A COMMENT