29-30 lot Attaoufik - Sidi Mâarouf - 20190 Casablanca - MAROC
+ (212) 522 32 15 37/38
    Station de prétraitement | RADEM | 4000 l/s

    Station de prétraitement

    In the modern industrialized world, construction usually involves the translation of designs into reality.

    | Client : ONEE

    | Situation : Saidia

    | Débit : 370 l/s

    | 
Catégorie : Pompage

    Descriptifx

    A formal design team may be assembled to plan the physical proceedings, and to integrate those proceedings with the other parts. The design usually consists of drawings and specifications, usually prepared by a design team including Architect, civil engineers, mechanical engineers, electrical engineers, structural engineers, fire protection engineers, planning consultants, architectural consultants, and archaeological consultants.

    LEAVE A COMMENT

    Berkane aerated lagoon wastewater treatment Station | ONEE | 100 l/s

    Station d’épuration lagunage aéré de Berkane

    In the modern industrialized world, construction usually involves the translation of designs into reality.

    | Client : ONEE

    | Situation : Saidia

    | Débit : 370 l/s

    | 
Catégorie : Pompage

    Descriptifx

    A formal design team may be assembled to plan the physical proceedings, and to integrate those proceedings with the other parts. The design usually consists of drawings and specifications, usually prepared by a design team including Architect, civil engineers, mechanical engineers, electrical engineers, structural engineers, fire protection engineers, planning consultants, architectural consultants, and archaeological consultants.

    LEAVE A COMMENT

    M’rirt aerated lagoon wastewater treatment Station | ONEE | 50 l/s

    Station d’épuration lagunage aéré de M’rirt | ONEE | 50 l/s

    In the modern industrialized world, construction usually involves the translation of designs into reality.

    | Client : ONEE

    | Situation : Saidia

    | Débit : 370 l/s

    | 
Catégorie : Pompage

    Descriptifx

    A formal design team may be assembled to plan the physical proceedings, and to integrate those proceedings with the other parts. The design usually consists of drawings and specifications, usually prepared by a design team including Architect, civil engineers, mechanical engineers, electrical engineers, structural engineers, fire protection engineers, planning consultants, architectural consultants, and archaeological consultants.

    LEAVE A COMMENT

    Rehabilitation of the activated sludge treatment Station in Hoceima | ONEE | 3 l/s

    Réhabilitation de la station d’épuration boues activées de Hoceima

    In the modern industrialized world, construction usually involves the translation of designs into reality.

    | Client : ONEE

    | Situation : Saidia

    | Débit : 370 l/s

    | 
Catégorie : Pompage

    Descriptifx

    A formal design team may be assembled to plan the physical proceedings, and to integrate those proceedings with the other parts. The design usually consists of drawings and specifications, usually prepared by a design team including Architect, civil engineers, mechanical engineers, electrical engineers, structural engineers, fire protection engineers, planning consultants, architectural consultants, and archaeological consultants.

    LEAVE A COMMENT