In the modern industrialized world, construction usually involves the translation of designs into reality.
| Client : ONEE
| Situation : Saidia
| Débit : 370 l/s
|
Catégorie : Pompage
A formal design team may be assembled to plan the physical proceedings, and to integrate those proceedings with the other parts. The design usually consists of drawings and specifications, usually prepared by a design team including Architect, civil engineers, mechanical engineers, electrical engineers, structural engineers, fire protection engineers, planning consultants, architectural consultants, and archaeological consultants.